Red Iron Architects provides innovative and sustainable design that enlivens the way you work and live.
← Back to Projects

The Citadel Murray Barracks Shower Renovations

This scope included demolition and renovation for the existing shower rooms on the North side of the Murray barracks (8 men’s rooms and 1 women’s room). Removal of existing floor, mortar bed, shower drains, and wall tile. New construction includes thick-set mortar bed, porcelain floor tile, wall tile, epoxy grout, shower partitions, new floor drain, shower partitions and bathroom stalls. In addition, replacement of wood benches and painting the ceilings.