Name:
DC Machine - Addition
Location:
Summerville, SC
Size:
13,500 SF addition
Cost:
$1.3 million
Contractor:
Carolina Contracting Solutions
Completed:
September 2015
Project Description:
DC Machine, a company that specializes in the manufacturing and testing of gun barrels as well as other specialty items (surgical lights for use on ships?!?), had four requests for their project; more production space, new office design vision, and additional parking – all while they remained in full operation. Upon the purchase of the adjacent parcel of land, we were up for the test.
DC has an existing warehouse and factory space that worked for them, but they needed more space for the growing production side of their business. Also, their existing office space was adequate enough in size to meet their needs, but it didn’t satisfy the owners’ aesthetic vision for the future of their business. Finally, their need for additional parking was becoming apparent as the overlap of employees during shift change was causing them to have to move their cars later in the day.
The new design was created and goals were met by accomplishing the following; the new office addition was placed behind the current offices so it could be constructed without disturbing the function of the existing office space. The demolition of the existing office will result in more parking close to the front entry. Placing another warehouse space behind the existing provided adequate separation for fire requirements, and the new office also acts as a shared connection between the existing and new production spaces. Finally we added a coat of paint to the existing building and the final visual now reflects the more modern tastes of the young owners.